# What did a Makerere study find about servicing PSA plants in Uganda?

**What did the Makerere University case study for the Lancet Commission on Medical Oxygen Security find about PSA plant numbers, spare parts and servicing in Uganda?**

A Makerere University case study for the Lancet Global Health Commission on Medical Oxygen Security reports 33 PSA generators operating in Uganda, from 15 to 100 m³/hour, 27 more being installed by June 2024, and finds that the plants had no recurrent budgets for maintenance and that spare parts were often imported.

This answer reads a 14-page country case study by authors from Makerere University for the Lancet Global Health Commission on Medical Oxygen Security. Its methods note says it is based on 10 key informant interviews, extracts from national newspapers and reports of four workshops held between January and June 2024.

## Plant numbers as the study gives them

The study says 33 PSA generators operate nationwide, with capacities ranging from 15 m³/hour to 100 m³/hour, and that by June 2024 27 additional PSA generators were in various stages of installation.

## Servicing and spare parts, as found

- The study found that PSA plants did not have recurrent budgets for routine maintenance, servicing and repair, and that electricity for the plants was not provided for in facility operations budgets.
- Interviewees said the paucity of spare parts due to the diverse brands in service was a major constraint, and that it was common for breakdowns to last weeks for lack of spare parts, which often had to be imported.
- The study says health facilities were contractually bound to order spares from the original foreign suppliers, and that external suppliers engaged local agents to service the equipment.
- One interviewee, a Ministry of Health official, said some hospital plants have failed for lack of servicing agreements with equipment suppliers.
- The study reports that at Kabale Regional Referral Hospital a PSA plant had been broken down for close to six months at the time of the study, and that the hospital had to procure oxygen in cylinders more than 400 kilometers away, in Kampala.

## What the authors recommend

The key messages say building a critical mass of qualified biomedical engineers competent in medical oxygen equipment management should be a priority, and that delegating responsibility for maintenance and servicing of PSA plants to the National Medical Stores would build technical expertise and attract dedicated budgets.

## What the study does not say

It does not say how many plants are working today. For the power side of the same problem, see [what power support Uganda's hospital oxygen plants have received](https://library.ultracontrolo.com/answers/what-power-support-has-uganda-given-its-hospital-oxygen-plants/). For what a tender can ask on after-sales service, see [whether an oxygen tender should require local after-sales service](https://library.ultracontrolo.com/answers/should-an-oxygen-tender-require-local-after-sales-service/).

## Sources

- [Makerere University authors, Uganda country case study, Lancet Global Health Commission on Medical Oxygen Security (PDF), read 19 November 2026](https://stoppneumonia.org/wp-content/uploads/2025/02/Uganda-Country-Case-Study.pdf)

Reviewed: 2026-11-19. Ultra Controlo engineering. https://library.ultracontrolo.com/answers/what-did-a-makerere-case-study-find-about-servicing-psa-plants-in-uganda/