# What did a 2014 audit say about French Polynesia CHPF oxygen?

**What did the French Polynesia audit chamber's 2014 report say about the oxygen generators at the Centre hospitalier de la Polynésie française?**

The Chambre territoriale des comptes de la Polynésie française reported in its final observations of 23 May 2014 that the Centre hospitalier de la Polynésie française put a medical oxygen unit into service in August 2013, with four generators, a cylinder backup and a two-year stock of spare parts.

## What the 2014 report says

The Chambre territoriale des comptes de la Polynésie française examined the hospital's management and adopted its final observations at a session on 23 May 2014. This page describes the hospital as it stood in that report, not as it is today. In a section on savings measures already taken or considered, the report describes the oxygen unit as follows.

- The medical oxygen production unit was put into service in August 2013.
- At the time of the report, four generators of "pure oxygen at 95%", in the report's wording, supplied the hospital's network.
- In case of failure, they were backed up by 120 cylinders, which the report says give 96 hours of emergency autonomy.
- Because of the remoteness of French Polynesia, a two-year stock of spare parts had been built up to cope with possible breakdowns.

## Why the hospital did it, according to the report

The report lists the unit among the hospital's savings measures, as an alternative to the previous oxygen supply contract. It gives its own estimates of the saving and of the investment; this page does not repeat the amounts.

## What the report does not cover

The report does not name the generator technology, the flow of the plant or its supplier, and it says nothing about the plant after 2014.

### How many generators did the CHPF have in 2014?

The chamber's 2014 report says four generators supplied the hospital network once the unit entered service in August 2013.

### Did the report mention spare parts?

Yes. It says a two-year stock of spare parts was built up because of French Polynesia's remoteness.

## Sources

- [Chambre territoriale des comptes de la Polynésie française, final observations on the Centre hospitalier de la Polynésie française, session of 23 May 2014, p. 38](https://www.ccomptes.fr/sites/default/files/EzPublish/PFR201407.pdf)

Reviewed: 2026-11-20. Ultra Controlo engineering. https://library.ultracontrolo.com/answers/what-did-french-polynesias-audit-chamber-report-on-the-chpf-oxygen-generators/