PATH's November 2023 analysis of 50 PSA plants found 30 overdue for maintenance and only 16 of 43 facilities outsourcing it, and WHO reported in 2022 that four of six assessed hospital oxygen plants in Benin were completely idle in May 2021, out of service since 2019 for lack of maintenance.

The sources read for this page measure missed maintenance and the state of service contracts separately. They do not isolate plants with no contract from plants with a contract, so this page reports each finding as the source gives it.

## What PATH found in 50 plants

PATH's report of November 2023, written for decision-makers, analysed 43 facility reports from eight countries in Africa and Latin America that had assessed 50 PSA plants. The findings on maintenance were these.

- 30 of the 50 plants were overdue for maintenance at the time of the facility assessment. Only 5 plants older than one year were up to date, and 14 were new installations.
- Only 1 facility had any spare parts on site, and 21 were confirmed as having none. None of the facilities noted having a maintenance log.
- Of the 43 facilities, 2 had a formally trained technician and 3 an informally trained one, while 20 had poor or no training.

## The state of service contracts

About a third of the facilities (16 of 43) outsourced maintenance to a service provider. Of those 16, 5 had an active contract in good standing, 2 were behind on payments, 4 had reached the end of their contract without renewing it, and 5 had unspecified details or scheduled visits individually. Of the other 27 facilities, 10 had no maintenance service provider and the status of 17 was unknown.

PATH also reports that a contract did not guarantee uptime: two plants under an active service contract at the time of reporting were still not working, and another failed shortly after a service visit from the installer.

## A case reported by WHO: Benin

A WHO Africa report of 10 November 2022 says that in May 2021 a WHO assessment found that, of the six hospitals with oxygen production units in Benin, four were completely idle: the zone hospitals of Djidja, Cové and Djougou and the university departmental hospital centre of Parakou. The French version says the plants had been out of service since 2019 for lack of maintenance. The English version adds that the poor state of the plants led some hospitals to source oxygen from private suppliers, sometimes across borders. WHO financed repairs, including replacing air blocks and thermostatic valves and repairing pneumatic connections, and trained five biomedical technicians; WHO says production was restored at the four facilities.

## What the sources suggest

PATH's solutions include improving the understanding of the total cost of ownership and proactively allocating budget toward preventive and corrective maintenance, and stipulating operations and maintenance training for facility staff in plant procurements. UNICEF states that donated equipment often breaks down or remains non-functional because of a lack of skilled staff and limited financing. See what a medical gas maintenance contract covers and [what maintenance a PSA oxygen plant needs](https://library.ultracontrolo.com/answers/what-maintenance-does-a-psa-oxygen-plant-need/).

### Does a service contract guarantee that a PSA plant keeps running?

PATH reports that two plants under an active service contract were still not working when assessed, so a contract alone did not guarantee uptime.

### Why were the Benin plants idle?

The French version of WHO's report of 10 November 2022 says the plants had been out of service since 2019 for lack of maintenance.

## Sources

- [PATH, Pressure swing adsorption plants: common issues and solutions to prevent future disrepair (November 2023), key takeaways and pages 8 to 9](https://media.path.org/documents/Root_cause_analysis_report_external_clean.pdf)
- [WHO Africa, "Un nouveau souffle contre la COVID-19 au Bénin" (10 November 2022, French)](https://afro.who.int/fr/countries/benin/news/un-nouveau-souffle-contre-la-covid-19-au-benin)
- [WHO Africa, "In Benin, a new lease on life against COVID-19" (10 November 2022)](https://afro.who.int/pt/node/16926)
- [UNICEF, Public-private partnerships for reliable oxygen supply](https://www.unicef.org/innovation/public-private-partnerships-reliable-oxygen-supply)

Reviewed: 2026-11-19. Ultra Controlo engineering. https://library.ultracontrolo.com/answers/what-happens-when-a-hospital-psa-plant-has-no-maintenance-contract/