Short answer

Global Fund guidance (2025) says a spare part on hand can bring an oxygen plant back within 1 to 2 hours, against 1 to 2 months or longer when it must be ordered; WHO's 2020 interim PSA specification (superseded in 2024) called for supplies and spare parts for 5 years of operation in resource-limited settings.

PATH's analysis of PSA plant failures (November 2023), based on 43 facility reports from eight countries in Africa and Latin America, found that only 1 facility noted having any spare parts on site, and that the challenges faced by public facilities and suppliers result in delays of three months to a year in accessing spare parts, or no access at all. In its combined data set of 84 plants it counted 29 PSA plant brands from companies headquartered in 12 countries, whose suppliers often lack a local presence in the countries they supply.

A stock deep enough to wait

  • How much: Global Fund sustainability guidance (22 August 2024) recommends a spare parts inventory of at least two years, from a list developed with the manufacturer, and its spare parts guidance (25 September 2025) advises ordering spare parts for two years of operation at a time, noting lead times of several weeks to several months, especially for specialised components. In UNDP procurement (REQ-OXY-001, 2025), spare part kits must remain available throughout the plant's lifespan.
  • Where it is held: in supplier-managed storage, the 2025 guidance notes, parts may be stored with a local partner or at the supplier's factory.
  • What fails: AIGA 113/20, adopted from EIGA Doc 195, says the most common technical problems likely to occur with oxygen 93 concentrator units relate to the reliability of the air compressors, the adsorbers' system valves, the process monitoring equipment and the analysers.
  • The right part: Global Fund guidance asks for the machine's serial number on every order and for parts only from the manufacturer or an authorised distributor. See what spare parts a PSA plant should keep.

Oxygen while the plant is down

For a reserve of oxygen 93 in a high-pressure reservoir refilled on site, AIGA 113/20 recommends a capacity that keeps the supply going while new supply is being arranged or until a source is reinstated, weighing among other factors the distance from an alternative source of supply, the availability of the maintenance provider and the reliability of the site electricity supply. PATH reports a facility whose nearest city able to fill cylinders or provide maintenance was 900 km away: with its PSA plant down, it transported and filled 50 cylinders per week. Global Fund sustainability guidance asks for a backup plan with a defined maximum number of days of plant shutdown and an escalation procedure.

Local skills and remote support

  • Local maintenance plan: Global Fund sustainability guidance says that, where there is no local service agent, for example for plants outside warranty and maintenance contract, a maintenance plan to be executed by the host facility's engineers should be developed, and staff may need advanced training to carry out the plan the manufacturer recommends.
  • Training when contracts end: the Global Fund staffing note (11 April 2025) lists post-service-agreement training, as operators' and supervising engineers' responsibilities increase after service contracts end.
  • Manuals and ordering language: PATH recommends graphic-rich operating and maintenance manuals and spare parts lists in the local language, and training technicians on how to assess plants, which suppliers to contact and what technical language to use when ordering parts.
  • Remote support: UNDP asks service level agreements to state lead times for spare parts, stockpile locations, remote support capabilities and the availability of local agents.
  • Familiar technology: the Global Fund note on PSA, VPSA and VSA (4 March 2025) recommends technology already common and functional in the region, which indicates technicians who can maintain it and an established supply chain for spare parts.

Ultra Controlo supplies original spare parts for its systems through UltraCare, its programme of preventive and corrective maintenance and emergency support.

More questions

How many years of spare parts should a hospital keep?

Global Fund guidance (2024) recommends at least two years in stock; WHO's 2020 interim specification said supplies and spare parts for 5 years of operation are needed in resource-limited settings.

Can parts from any supplier be used?

Global Fund guidance (2025) advises buying only from the manufacturer or an authorised distributor, as parts from unauthorised suppliers may void the warranty.