Where should medical gas pipes not be routed?

Where should medical gas pipelines not run under HTM 02-01, such as lift shafts, kitchens or boiler houses?

Short answer

Under HTM 02-01 (2026), the NHS England guidance, exposed medical gas pipelines should not be installed in lift shafts, kitchens, laundries, boiler houses, generator rooms, incinerator rooms, stores for combustible materials or any other fire-risk area, and installations should be kept away from mechanical or chemical damage, excessive heat and contact with oil.

The routing rules sit mainly in chapter 15 of HTM 02-01 Part A (2026 edition), the NHS England guidance on medical gas pipeline systems; other countries apply their own codes.

Places to keep pipes out of

  • Exposed pipes: lift shafts, kitchens, laundries, boiler houses, generator rooms, incinerator rooms, storage rooms designed for combustible materials and any other fire-risk area.
  • Areas where the pipes may suffer mechanical damage, chemical damage or excessive heat, or splashing, dripping or permanent contact with oil, grease or bituminous compounds, or electrical sparks.
  • Close to natural gas pipelines, where a leak could let flammable gas accumulate.
  • Enclosed ducts shared with other services where the pipes cannot be inspected.
  • Inside the area that an area valve service unit (AVSU) isolates, for the mains that feed it, unless extra protection is added: pipelines supplying AVSUs should come from outside the fire compartment being protected (see zone valve box location).

Where a run through a hazardous area cannot be avoided, the pipes should be enclosed in non-combustible, non-corrosive materials that have no electrolytic reaction with copper.

Routes that need extra care

  • Shared ducts: in ducts with steam mains or water services, pipes should be inspected annually, because chloride deposits after a leak can corrode them. Ducts or voids holding valves or other mechanical connections should have adequate ventilation; runs brazed along their entire length and fully pressure-tested need none.
  • Clearances: at least 25 mm between services, and at least 150 mm between medical gas pipes and heating, hot water or steam pipes.
  • Electric cables: routes should keep the pipes from touching cables and wiring (see bonding and earthing).
  • Walls and floors: pipes should not be concealed in walls or encapsulated in floors; where that cannot be avoided, the route should be clearly shown on the as-fitted drawings. Stud or plasterboard partitions are acceptable if the pipes are protected against corrosion and damage such as drilling.
  • Outside and underground: external runs should be avoided wherever practicable, and buried lines should run in appropriately drained ducts of at least 450 mm by 450 mm with removable covers.
  • Inside the building: internal pipes should be protected where trolleys and tugs could damage them.
  • Treated timber and MRI suites: pipework may corrode in contact with timber treated with fire-retardant compounds, and MRI suites may need waveguides to keep their radio frequency shielding intact.

In Portugal, the ACSS specification ET 03/2006 (revised 2024) asks for all pipe runs to be installed with access for repair and maintenance in mind.

More questions

Can medical gas pipes run through a kitchen if they are boxed in?

HTM 02-01 says exposed pipelines should not be installed in kitchens; where a hazardous area cannot be avoided, the pipes should be enclosed in non-combustible, non-corrosive material with no electrolytic reaction with copper.

How far should medical gas pipes be from steam or hot water pipes?

At least 150 mm under HTM 02-01, with at least 25 mm between any two services.

Sources