Short answer

According to Afrobarometer Dispatch No. 1178 of 7 May 2026, based on a July 2024 survey of 1,200 adults, 55% of Zambians live in zones served by the ZESCO grid, 28% say their household is connected and only 4% have a connection that they say works most or all of the time.

Request a quoteBuying a PSA oxygen plant in Zambia

This answer reads Afrobarometer Dispatch No. 1178, a 15-page PDF published on 7 May 2026. It reports a household survey, not a measurement of the grid and not a study of hospitals. The fieldwork was done in July 2024, during the electricity crisis the dispatch describes.

What the survey found

  • Afrobarometer interviewed a nationally representative sample of 1,200 adult citizens between 8 and 28 July 2024, with a margin of error of plus or minus 3 percentage points.
  • 55% live in zones served by the ZESCO grid, but only 28% say their households are connected to it.
  • Among those who are connected, 15% say their electricity works most or all of the time.
  • Combining the two rates, the dispatch says 4% of all Zambians enjoy a reliable supply from the national grid.
  • 47% say their households use power from a source other than the ZESCO grid, mostly solar panels (83% of that group).

The background the dispatch gives

The dispatch says hydropower accounts for 84% of electricity supply, that the shortfall between generation and demand reached 1,600 megawatts in February 2024, and that ZESCO has implemented load shedding for up to 21 hours per day, citing a 2024 source. It says the crisis has been attributed to low reservoir levels and the worst drought in the past five decades.

What the dispatch does not say

The survey asks households about their own supply, so its percentages cannot be read as the supply to a hospital. The text read does not discuss health facilities or oxygen. Conditions may also have changed since July 2024. For what to plan around when a hospital's mains supply is poor, see whether a PSA plant needs a generator or UPS and whether a PSA plant can run on solar power. For health facilities across the region, see how reliable electricity is in sub-Saharan African health facilities.

More questions

Is this the grid reliability of Zambian hospitals?

No. It is a household survey from July 2024; it does not give a figure for hospitals.