What did Zambia's Ministry of Health say about the country's existing PSA oxygen plants, and what did it plan to install, in its 2022 to 2026 national medical oxygen strategic plan?

Short answer

According to Zambia's Ministry of Health National Medical Oxygen Strategic Plan for 2022 to 2026, the country had ten PSA plants in public facilities, nine of them functional and half in Lusaka, and the plan's activities included procuring and installing 10 duplex PSA systems with filling capacity for provincial hubs.

Request a quoteBuying a PSA oxygen plant in Zambia

This answer reads the Zambia National Medical Oxygen Strategic Plan, a 2022 Ministry of Health document, on 20 November 2026. It describes the position in 2022 and what the plan proposed. It is not a record of what was later built. For a UNOPS report of April 2026 on six commissioned plants, see what UNOPS said about Zambia's sixth PSA oxygen plant.

The plants in 2022

The plan's situation analysis says the country has ten existing PSA plants, but only nine are functional, located in five provinces with 50 percent of them in Lusaka. It says the plants at Lewanika General Hospital and Mansa General Hospital function suboptimally, and a footnote gives the reason as frequent breakdowns and lack of adequate service and maintenance.

Weaknesses and threats the plan lists for PSA plants

  • Weakness: limited technical know-how to service and maintain plants.
  • Threat: production by PSA plants of poor oxygen purity recordings when availability of service and maintenance parts is constrained.
  • Threat: inability of the available PSA plants to produce the desired quantities of oxygen due to the plants' size.

What the plan proposed

  • Strategic objective 1 is to strengthen medical oxygen supply systems in 60% of public hospitals in Zambia.
  • Activity 1.1.1 is to conduct feasibility studies on oxygen production and filling capacity in all 10 provinces, including the sizing and filling capacity of proposed PSA installation sites in provincial hubs.
  • Activity 1.1.3 is to procure and install 10 duplex PSA systems with filling capacity for provincial hubs.
  • Activity 1.2.1 is to procure and install oxygen manifolds and reticulation for all level 1, 2, and 3 hospitals.

What this does not show

The plan does not give a plant size for the new systems, and the activity list is a plan, not an order. For Zambia's tender registration route, see how suppliers register on Zambia's e-GP system.

More questions

Does the plan say the 10 duplex systems were bought?

No. It lists them as an activity. The plan is from 2022.