Short answer

According to Douala General Hospital's tender dossier of November 2024, its 12-month maintenance and operation contract for the oxygen production unit (2025 budget year) was open to Cameroonian-law companies specialised in medical device maintenance, with an eliminatory technical score of 85 out of 100.

Who could bid

  • A national open tender under the urgency procedure, with a single lot and offline submission.
  • Participation was open to companies under Cameroonian law specialised in medical device maintenance with the necessary financial capacity.
  • Eliminatory criteria included a missing bid security, a missing site-visit declaration, a missing representation contract with the manufacturer of the oxygen unit, and a technical score below 85 out of 100.

What the contractor had to do

  • Check daily that the unit works and produces medical oxygen without interruption.
  • Carry out preventive maintenance and repair, and produce intervention sheets for every fault.
  • Submit a maintenance calendar within 3 weeks of the start order, and produce monthly reports and an annual failure report covering cause, solution, time and cost.
  • Supply the parts needed for scheduled maintenance or repair; parts for interventions the hospital requested outside preventive maintenance were at the hospital's expense, and replaced parts became the hospital's property.

Key staff and unit

Three key staff were required: a technician with at least two years of practical experience, a supervising engineer with at least two years, and a mission head with at least three years including specific medical device maintenance missions. The terms describe the hospital's unit as a screw-compressor plant with a 150 bar filling ramp for cylinders from 5 to 50 litres and a stated capacity of 20 cylinders in 16 hours.

This is one hospital's tender, not a national rule. For related guidance, see what manufacturer authorisation means in an oxygen tender, whether a tender should require local after-sales service and how Cameroon hospital tenders are published.

More questions

Is this a national requirement for oxygen plant maintenance in Cameroon?

No. It is the content of one hospital's tender dossier and says nothing about national rules.