What does a site need before an oxygen plant is installed?
Short answer
For an ULTRAOX plant, the hospital provides a clean, level area reachable by a crane, a drain for condensate, anchoring for the equipment, three-phase power and the licences to install and operate it.
The ambient air must be reasonably free of dust, at an acceptable humidity and free of chemical contamination, the area must not be classed as electrically hazardous, and no one may smoke within 10 metres of the plant. The plant can run from a diesel generator, and the existing oxygen installation can stay in place: ULTRAOX connects to it as a new source.
Sources
- Ultra Controlo, Medical gas answers: ULTRAOX datasheet 2022, p. 9; ULTRAOX SC datasheet, p. 3.
- ultracontrolo.com: ULTRAOX
Ultra Controlo figures come from its technical datasheets. Third-party facts were read at the source on the date shown.
Related
- AnswersCan a PSA tender set a maximum kWh per cubic metre?
- AnswersDoes Ultra Controlo train hospital staff?
- AnswersHow can a ministry train enough technicians for its oxygen plants?
- AnswersHow can ministries buy oxygen equipment spare parts centrally?
- AnswersHow do delay penalties work in oxygen plant contracts?
- AnswersHow is a donor-funded oxygen plant handed over to the ministry?