Two 2026 TED notices show what such tenders specified: Cogersa in Asturias (14136-2026) tendered for spare parts and preventive and corrective maintenance for its compressed air installations, with separate award criteria for each, and ENSAM in Lille (167490-2026) tendered for preventive and corrective maintenance of compressors and their ancillary equipment.

What the two notices contained

Source: the two TED notices, as published.
ItemCogersa, Asturias (TED 14136-2026)ENSAM, Lille (TED 167490-2026)
Published9 January 2026 (OJ S 6/2026)11 March 2026 (OJ S 49/2026)
Deadline for tenders9 February 2026, 14:00 CET (closed)15 April 2026, 12:00 GMT (closed)
ObjectSpare parts and preventive and corrective maintenance services for the compressed air installations of its waste treatment centrePreventive and corrective maintenance of air compressors and their ancillary equipment for the Lille campus
Main CPV code42124330 Parts of air compressors, with 39721321 Compressed-air dryers and 50531300 Repair and maintenance services of compressors50531300 Repair and maintenance services of compressors
Duration2 years, extendable by successive 1-year periods up to a maximum total of 5 years3 years
Award criteria in the noticePrice of higher-rotation spare parts; corrective and preventive maintenance labour priced separately; discount on the manufacturer's tariff for lower-rotation parts; resources to reduce environmental impactNot listed in the notice
Other termsElectronic submission in Spanish; a specific waste management plan at the start of the serviceElectronic submission in French; electronic catalogue required; variants not allowed

Technical scope by component

A scope of work can list maintenance items per component. The basic maintenance checklist in Compressed Air Challenge (CAC) Fact Sheet #5 (May 2026) covers:

  • Inlet filter cartridges: inspect and clean or replace per manufacturer specifications.
  • Drain traps: clean out debris and check operation periodically.
  • Compressor lubricant and lubricant filter: inspect the level daily; top off, replace and change per manufacturer specifications.
  • Air lubricant separator on lubricant-injected rotary screw compressors: change per manufacturer specifications or when the pressure drop exceeds 10 psid, whichever is less.
  • Air line filters: replace particulate and lubricant removal elements when pressure drop exceeds 2 to 3 psid, and inspect all elements at least annually.
  • Belt condition, operating temperature, the water cooling system, system leaks and system cleanliness.

Records

The same fact sheet says one person should be given the responsibility of ensuring that all maintenance is performed properly, on schedule and adequately documented. The 2016 DOE sourcebook recommended recording the dates of all maintenance and repairs, including a list of all parts replaced or serviced.

For the maintenance offer of Ultra Controlo, see does Ultra Controlo offer maintenance contracts.

More questions

Which CPV code covers compressor maintenance?

Both 2026 notices used CPV 50531300, repair and maintenance services of compressors; Cogersa's main code was 42124330, parts of air compressors.

Can preventive and corrective work be priced separately?

The 2026 Cogersa tender did so, with separate price criteria for preventive and for corrective maintenance labour.