Vacuum and AGSS
Why does a hospital vacuum plant run all the time?
Why can a hospital vacuum plant run continuously, and how are running hours and leakage checked?
Short answer
A hospital vacuum plant is designed to run often or continuously: HTM 02-01 (2026), the NHS England guidance, says all vacuum pumps should be designed for high-frequency stop/start or continuous operation, and the ULTRAVAC CLP datasheet says its variable speed pump matches production to consumption, stopping when there is no consumption.
How the plant is controlled
HTM 02-01 asks for a vacuum vessel sized to minimise the stop/start cycles of the plant, with the number of cycles per hour not exceeding the manufacturer's recommendation, typically six. The pump start (cut-in) setting allows for the pressure drop across the pipeline and the bacteria filters and should be set around 550 mmHg, subject to plant design. The off (cut-out) setting should be chosen on the pump performance curve to minimise stop/start cycling, at a vacuum level the pump can achieve and that suits a demand-led control arrangement, and may be expected at about 650 mmHg.
ULTRAVAC systems aim to provide medical vacuum continuously, with fully automatic operation, using 1 to 12 pumps and vacuum vessels of 24 to 6,000 litres. In the variable speed ULTRAVAC CLP, the drive adjusts the pump speed to the vacuum required by the network; the datasheet says production equals consumption, and with no consumption the pump goes into standby mode and stops.
What to record
HTM 02-01 asks for these readings and records:
- a total hours counter for each pump, in the starter unit or the plant control unit;
- weekly: hours run for each pump, the vacuum cut-in and cut-out levels on the duty pump gauge, the running current of the duty pump and any alarm conditions on the control panels;
- at planned maintenance: the hours run for each pump and, for VSD plant, the running current and stabilised vacuum level under normal load;
- BMS connections that include the running status of each vacuum pump.
HTM 02-01 Part B says the hours-run readings can be used with the manufacturers' recommendations to adjust the maintenance programme. For design, Part A states the intention to use the most efficient pumps and compressors and to remove unused and unnecessary gases and terminal units.
How leakage is checked
- At commissioning, the HTM 02-01 vacuum leakage test expects no loss of vacuum over at least two hours once the system has settled.
- Among the HTM 02-01 Part B permit-to-work tests, the pipeline vacuum leakage test (PVL) isolates an area, drops the vacuum to a set level and monitors it with digital gauges for 15 minutes.
- Terminal units are tested quarterly: a blank probe checks gas-specificity, mechanical function and leaks, and a test instrument checks flow and pressure drop.
More questions
How often should a vacuum pump start and stop?
HTM 02-01 (2026) says the number of cycles per hour should not exceed the manufacturer's recommendation, typically six, and sizes the vessel to minimise stop/start cycles.
Can a variable speed vacuum pump stop completely?
The ULTRAVAC CLP datasheet says that when there is no consumption, the variable speed pump goes into standby mode and stops.
Sources
- NHS England, HTM 02-01 Medical gas pipeline systems (2026), Part A, 1.8, 10.18, 10.19, 10.31, 10.32, 10.50, 10.56 and 19.219
- NHS England, HTM 02-01 Medical gas pipeline systems (2026), Part B, 11.113, weekly tasks for vacuum plant, central vacuum plant maintenance tasks, PVL test and 11.213
- ULTRAVAC datasheet, p. 2, p. 3 and p. 5
- ULTRAVAC CLP datasheet, p. 2
Ultra Controlo figures come from its technical datasheets. Third-party facts were read at the source on the date shown.
Related
- AnswersCan a medical vacuum plant use less energy?
- AnswersHow is a hospital medical vacuum plant sized?
- AnswersWhat vacuum level does a hospital suction system need?
- ProductsULTRAVAC CLP: specifications and models
- AnswersWhy does bedside suction lose power?
- AnswersHow is a medical gas pipeline pressure tested for leaks?