Do medical air receivers need pressure vessel inspections?

Do the air receivers of a medical air plant need periodic pressure vessel inspections, and who carries them out?

Short answer

Under Spain's Real Decreto 809/2021, pressure equipment of categories I to IV undergoes periodic inspections by an installer company or an authorised control body, while the EU Pressure Equipment Directive 2014/68/EU covers design, manufacture and conformity assessment; check the rules of the country of use.

In the documents used here, in-service inspection of pressure vessels comes from national rules, not from the EU directive. This page gives what three official documents say: the EU Pressure Equipment Directive, Spain's pressure equipment regulation, and the NHS England guidance HTM 02-01 (2026). It does not state the position of any other country.

What the EU directive covers

Directive 2014/68/EU, Article 1(1), applies to the design, manufacture and conformity assessment of pressure equipment and assemblies with a maximum allowable pressure PS greater than 0.5 bar. Its Annex I, 3.4(a), requires pressure equipment made available on the market to be accompanied by instructions for the user with the necessary safety information on mounting, putting into service, use and maintenance including checks by the user. The directive itself is described in Pressure Equipment Directive 2014/68/EU.

Spain

Real Decreto 809/2021 of 21 September, the Reglamento de equipos a presión, was published in the BOE of 11 October 2021 (the consolidated text was last updated on 3 September 2025). Its Article 6(1) says all pressure equipment of categories I to IV of Real Decreto 709/2015 is periodically submitted to the inspections and tests that guarantee the maintenance of the technical and safety conditions. Article 6(4) says the periodic inspections are carried out by a pressure equipment installer company or by an authorised control body (organismo de control habilitado).

  • Annex III sets the intervals and the agents by category and fluid group, and defines three inspection levels: level A, in-service inspection; level B, out-of-service inspection, carried out by authorised control bodies; and level C, out-of-service inspection with a pressure test.
  • Note 3 to Table 1 of Annex III concerns vessels of compressed air or nitrogen whose product of the maximum service pressure in bar by the volume in litres is below 5,000: the inspections may be carried out by pressure equipment installer companies. A Ministry of Industry interpretation guide (REP-03-07, approved 2 December 2022) describes the same exception as allowing an authorised installer company to be the inspecting agent.

England

HTM 02-01 (2026) says air receivers should comply with the relevant British Standards and/or the EU Pressure Equipment Directive documentation and be supplied with relevant certification (7.48). To facilitate statutory inspections, it says there should be either two suitably valved air receivers or a bypass arrangement for use in manual operating mode only (7.51). It also says it is necessary under PSSR 2000 to notify the Competent Person (PSSR) if repairs and modifications are made to the pressure system (19.308).

Ultra Controlo

The ULTRAAR SC datasheet (p. 3) lists receivers in vertical construction with capacities from 0.2 to 6 m3. Maintenance of the plant is covered in What maintenance does a medical air plant need?.

More questions

Does the Pressure Equipment Directive set periodic inspections?

Its Article 1(1) scope is the design, manufacture and conformity assessment of pressure equipment; the periodic inspections described on this page come from Spanish and English national texts.

Who can inspect a small compressed air vessel in Spain?

For vessels of compressed air or nitrogen whose pressure in bar multiplied by volume in litres is below 5,000, Real Decreto 809/2021 allows the inspections to be carried out by pressure equipment installer companies.

Sources